News & Analysis as of

Liquidated Damages Attorney's Fees

Klein Moynihan Turco LLP

Beware Of Pennsylvania Wiretap Laws!

If your business operates a website, it is imperative that you comply with the Pennsylvania Wiretapping and Electronic Surveillance Control Act. Readers of our blog are now aware of the growing influx of class action lawsuits...more

Lewitt Hackman

Franchisor 101: Liquidated Damages, 30 Minutes or Less

Lewitt Hackman on

A Michigan district court held a franchisee breached its obligations under its franchise agreements and upheld the liquidated damages clause in the agreements....more

Pierce Atwood LLP

There’s No Tying in Litigation - Factors to Determine the Winner for Fee Shifting Provisions

Pierce Atwood LLP on

Deciding whether to include a prevailing party attorneys’ fee provision in a contract is important, as doing so has significant risk and cost implications of litigation. Prevailing party provisions foster dispute...more

Lathrop GPM

Michigan Federal Court Grants Summary Judgment Enforcing Franchise Agreement Termination and Awarding Liquidated Damages and...

Lathrop GPM on

A federal court in Michigan granted Little Caesar Pizza Enterprises, Inc.’s motion for summary judgment seeking to enforce its termination of the franchise agreements between it and franchisee S&S Pizza Enterprises, Inc....more

Sherman & Howard L.L.C.

Second Circuit Provides Important Reminder to Employers Regarding Overtime Risks

Employers who rely on their workers to identify and report overtime as a prerequisite for payment may be setting themselves up for significant liability. As the U.S. Court of Appeals for the Second Circuit recently reminded...more

Parker Poe Adams & Bernstein LLP

Fourth Circuit Says Negligence Not Grounds for Awarding Additional Year of FLSA Overtime Pay

Employers that fail to pay required minimum wage or overtime under the Fair Labor Standards Act are liable for the amount of missed wages: doubled, plus attorneys fees, costs, and interest. The court can award such damages...more

Davis Wright Tremaine LLP

New York State Senate Passes Bill That Would Ban Post-Employment Noncompete Agreements

On June 7, 2023, the New York State Senate passed new sweeping legislation, Senate Bill S3100A (the "Bill"), which would ban post-employment noncompete agreements in New York. The Bill now heads to the New York State...more

Procopio, Cory, Hargreaves & Savitch LLP

California Appellate Court Invalidates the Ability to Obtain Default Interest on Loans That Have Not Matured

When a late fee is assessed upon the entire principal balance of the loan, is it invalid when the loan is not fully matured? This question, so important to lenders, has been addressed in California after the conclusion of...more

ArentFox Schiff

Class Action Year in Review: Courts Continue Close Scrutiny of Class Action Settlements

ArentFox Schiff on

Last year saw courts, particularly federal courts, continue their close scrutiny of class action settlements to ensure that they are fair and reasonable to class members, and do not unfairly prioritize the interests of class...more

Snell & Wilmer

Hogs Can Get Slaughtered on Fees in Utah if Their Claim is Too Greedy

Snell & Wilmer on

Construction contracts generally provide that the loser in a construction dispute must pay the attorneys’ fees of the prevailing party. But construction contracts, by their nature, can lead to outcomes in which it is hard to...more

Sheppard Mullin Richter & Hampton LLP

What Employers Need to Know About Newly Proposed Non-Compete Legislation in New Jersey

Following a nationwide trend, New Jersey recently joined a growing list of states seeking to limit the use of non-compete and non-solicitation agreements by employers. On May 19, 2022, the New Jersey Assembly’s Labor...more

Fox Rothschild LLP

“As Is” Purchases of Commercial Property May Come with Limited Remedial Tools to Avoid Closing, Business Court Confirms

Fox Rothschild LLP on

As failed commercial property deals go, the one at the heart of Miriam Equities, LLC v. LB-UBS-2007-C2 Millstream Road LLC, 2022 NCBC 3, was not outside the norm for a Business Court transaction autopsy. There was a missed...more

Holland & Knight LLP

Massachusetts SJC Upends Existing Law, Requires Treble Damages on Late-Paid Wages

Holland & Knight LLP on

The Massachusetts Supreme Judicial Court (SJC) on April 4, 2022, handed down a decision with major implications for Massachusetts employers accused of wage-and-hour law violations or late payment of wages. In Reuter v. City...more

Jackson Lewis P.C.

Does the Workers’ Compensation Act Bar BIPA Claims? Illinois Supreme Court Will Weigh In

Jackson Lewis P.C. on

The Illinois Supreme Court recently agreed to hear an appeal of an Appellate Court’s decision addressing whether an employee’s claim for damages under Illinois’s Biometric Information Protection Act is preempted by the...more

Ogletree, Deakins, Nash, Smoak & Stewart,...

When Is ‘No Fee’ a Reasonable Fee? 11th Circuit’s Guidance on Reasonableness in FLSA Attorneys’ Fees Cases

On February 1, 2021, in an unpublished opinion resolving a Fair Labor Standards Act (FLSA) attorney’s fees dispute, the Eleventh Circuit Court of Appeals, in Batista v. South Florida Womans Health Associates, Inc., struck...more

Jackson Lewis P.C.

Trial Court Properly Applied Rule 68 Offer Of Judgment And Reduced Attorney’s Fee Demand In FLSA Case, Eleventh Circuit Concludes

Jackson Lewis P.C. on

The plaintiff sought more than $12,000 in unpaid wages on his FLSA claims, rejected the defendant employer’s Rule 68 offer of judgment of $3,500 on those claims, and then was awarded only $97.20 plus an equal amount of...more

Lathrop GPM

The Franchise Memorandum - Issue # 254

Lathrop GPM on

Welcome to The Franchise Memorandum by Lathrop GPM, formerly known as The GPMemorandum. Below are summaries of recent legal developments of interest to franchisors. Given the widespread and evolving impact of the COVID-19...more

McAfee & Taft

Liquidated Damages in Purchase and Sale Agreements: Oklahoma

McAfee & Taft on

A buyer and seller of real estate will often include a liquidated damages provision in the purchase and sale agreement as a means for stipulating the amount of damages the seller will receive in the event of a breach of the...more

Butler Snow LLP

New Construction Lien Legislation in Tennessee

Butler Snow LLP on

Changes to Remedies in Lien Enforcement Actions - New legislation in Tennessee has limited the recovery of attorney’s fees, expenses, and actual and liquidated damages in instances where a real property owner seeks to...more

Proskauer - Law and the Workplace

New York State Poised to Expand Protections Against Discriminatory Pay Practices

Currently, the New York Equal Pay Act provides that no employee shall be paid at a lesser wage rate than an employee of the opposite sex in the same establishment for equal work on a job requiring equal skill, effort and...more

Bradley Arant Boult Cummings LLP

Illinois Supreme Court Adopts Expansive Interpretation of Standing under Illinois BIPA, Potentially Opening the Flood Gates for...

In a much-anticipated ruling, the Illinois Supreme Court recently held that allegations of actual injury are not required to seek damages under Illinois’ Biometric Information Privacy Act (BIPA or the Act). The case is...more

Sheppard Mullin Richter & Hampton LLP

Actual Injury Unnecessary to Sue Under Illinois Biometric Law

The Illinois Supreme Court recently handed down its much-anticipated decision in Rosenbach v. Six Flags Entertainment Corporation et al., clarifying what makes someone “aggrieved” and able to bring a claim under the Illinois...more

Obermayer Rebmann Maxwell & Hippel LLP

New Litigation Claims that the Federal Government is Violating Wage & Hour Law by Forcing Employees to Work Without Pay During the...

With the partial government shutdown reaching record lengths, several federal employees who have been required to work without pay have sought court intervention, alleging that this practice violates the Fair Labor Standards...more

Mintz - Employment Viewpoints

Two Recent FLSA Decisions Bring Good News to Employers

As 2018 came to a close, a pair of federal court decisions provide much needed guidance on two thorny wage and hour issues that are being increasingly litigated nationwide under the Fair Labor Standards Act (FLSA). In one...more

Proskauer - New England IP Blog

Defendants in Vineyard Vines Trademark Dispute Hit with Liquidated Damages and Attorneys’ Fees

In a recent decision out of the District of Connecticut, defendants MacBeth Collection, L.L.C, its affiliates, and owner found themselves in hot water when Judge Merriam determined they violated a permanent injunction barring...more

35 Results
 / 
View per page
Page: of 2

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
- hide

JD Supra Privacy Policy

Updated: Dec 28, 2021:

JD Supra is a legal publishing service that connects experts and their content with broader audiences of professionals, journalists and associations.

This Privacy Policy describes how JD Supra, LLC ("JD Supra" or "we," "us," or "our") collects, uses and shares personal data collected from visitors to our website (located at www.jdsupra.com) (our "Website") who view only publicly-available content as well as subscribers to our services (such as our email digests or author tools)(our "Services"). By using our Website and registering for one of our Services, you are agreeing to the terms of this Privacy Policy.

Please note that if you subscribe to one of our Services, you can make choices about how we collect, use and share your information through our Privacy Center under the "My Account" dashboard (available if you are logged into your JD Supra account).

Collection of Information

Registration Information. When you register with JD Supra for our Website and Services, either as an author or as a subscriber, you will be asked to provide identifying information to create your JD Supra account ("Registration Data"), such as your:

  • Email
  • First Name
  • Last Name
  • Company Name
  • Company Industry
  • Title
  • Country

Other Information: We also collect other information you may voluntarily provide. This may include content you provide for publication. We may also receive your communications with others through our Website and Services (such as contacting an author through our Website) or communications directly with us (such as through email, feedback or other forms or social media). If you are a subscribed user, we will also collect your user preferences, such as the types of articles you would like to read.

Information from third parties (such as, from your employer or LinkedIn): We may also receive information about you from third party sources. For example, your employer may provide your information to us, such as in connection with an article submitted by your employer for publication. If you choose to use LinkedIn to subscribe to our Website and Services, we also collect information related to your LinkedIn account and profile.

Your interactions with our Website and Services: As is true of most websites, we gather certain information automatically. This information includes IP addresses, browser type, Internet service provider (ISP), referring/exit pages, operating system, date/time stamp and clickstream data. We use this information to analyze trends, to administer the Website and our Services, to improve the content and performance of our Website and Services, and to track users' movements around the site. We may also link this automatically-collected data to personal information, for example, to inform authors about who has read their articles. Some of this data is collected through information sent by your web browser. We also use cookies and other tracking technologies to collect this information. To learn more about cookies and other tracking technologies that JD Supra may use on our Website and Services please see our "Cookies Guide" page.

How do we use this information?

We use the information and data we collect principally in order to provide our Website and Services. More specifically, we may use your personal information to:

  • Operate our Website and Services and publish content;
  • Distribute content to you in accordance with your preferences as well as to provide other notifications to you (for example, updates about our policies and terms);
  • Measure readership and usage of the Website and Services;
  • Communicate with you regarding your questions and requests;
  • Authenticate users and to provide for the safety and security of our Website and Services;
  • Conduct research and similar activities to improve our Website and Services; and
  • Comply with our legal and regulatory responsibilities and to enforce our rights.

How is your information shared?

  • Content and other public information (such as an author profile) is shared on our Website and Services, including via email digests and social media feeds, and is accessible to the general public.
  • If you choose to use our Website and Services to communicate directly with a company or individual, such communication may be shared accordingly.
  • Readership information is provided to publishing law firms and companies and authors of content to give them insight into their readership and to help them to improve their content.
  • Our Website may offer you the opportunity to share information through our Website, such as through Facebook's "Like" or Twitter's "Tweet" button. We offer this functionality to help generate interest in our Website and content and to permit you to recommend content to your contacts. You should be aware that sharing through such functionality may result in information being collected by the applicable social media network and possibly being made publicly available (for example, through a search engine). Any such information collection would be subject to such third party social media network's privacy policy.
  • Your information may also be shared to parties who support our business, such as professional advisors as well as web-hosting providers, analytics providers and other information technology providers.
  • Any court, governmental authority, law enforcement agency or other third party where we believe disclosure is necessary to comply with a legal or regulatory obligation, or otherwise to protect our rights, the rights of any third party or individuals' personal safety, or to detect, prevent, or otherwise address fraud, security or safety issues.
  • To our affiliated entities and in connection with the sale, assignment or other transfer of our company or our business.

How We Protect Your Information

JD Supra takes reasonable and appropriate precautions to insure that user information is protected from loss, misuse and unauthorized access, disclosure, alteration and destruction. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. You should keep in mind that no Internet transmission is ever 100% secure or error-free. Where you use log-in credentials (usernames, passwords) on our Website, please remember that it is your responsibility to safeguard them. If you believe that your log-in credentials have been compromised, please contact us at privacy@jdsupra.com.

Children's Information

Our Website and Services are not directed at children under the age of 16 and we do not knowingly collect personal information from children under the age of 16 through our Website and/or Services. If you have reason to believe that a child under the age of 16 has provided personal information to us, please contact us, and we will endeavor to delete that information from our databases.

Links to Other Websites

Our Website and Services may contain links to other websites. The operators of such other websites may collect information about you, including through cookies or other technologies. If you are using our Website or Services and click a link to another site, you will leave our Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We are not responsible for the data collection and use practices of such other sites. This Policy applies solely to the information collected in connection with your use of our Website and Services and does not apply to any practices conducted offline or in connection with any other websites.

Information for EU and Swiss Residents

JD Supra's principal place of business is in the United States. By subscribing to our website, you expressly consent to your information being processed in the United States.

  • Our Legal Basis for Processing: Generally, we rely on our legitimate interests in order to process your personal information. For example, we rely on this legal ground if we use your personal information to manage your Registration Data and administer our relationship with you; to deliver our Website and Services; understand and improve our Website and Services; report reader analytics to our authors; to personalize your experience on our Website and Services; and where necessary to protect or defend our or another's rights or property, or to detect, prevent, or otherwise address fraud, security, safety or privacy issues. Please see Article 6(1)(f) of the E.U. General Data Protection Regulation ("GDPR") In addition, there may be other situations where other grounds for processing may exist, such as where processing is a result of legal requirements (GDPR Article 6(1)(c)) or for reasons of public interest (GDPR Article 6(1)(e)). Please see the "Your Rights" section of this Privacy Policy immediately below for more information about how you may request that we limit or refrain from processing your personal information.
  • Your Rights
    • Right of Access/Portability: You can ask to review details about the information we hold about you and how that information has been used and disclosed. Note that we may request to verify your identification before fulfilling your request. You can also request that your personal information is provided to you in a commonly used electronic format so that you can share it with other organizations.
    • Right to Correct Information: You may ask that we make corrections to any information we hold, if you believe such correction to be necessary.
    • Right to Restrict Our Processing or Erasure of Information: You also have the right in certain circumstances to ask us to restrict processing of your personal information or to erase your personal information. Where you have consented to our use of your personal information, you can withdraw your consent at any time.

You can make a request to exercise any of these rights by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
150 Harbor Drive, #2760
Sausalito, CA 94965

You can also manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard.

We will make all practical efforts to respect your wishes. There may be times, however, where we are not able to fulfill your request, for example, if applicable law prohibits our compliance. Please note that JD Supra does not use "automatic decision making" or "profiling" as those terms are defined in the GDPR.

  • Timeframe for retaining your personal information: We will retain your personal information in a form that identifies you only for as long as it serves the purpose(s) for which it was initially collected as stated in this Privacy Policy, or subsequently authorized. We may continue processing your personal information for longer periods, but only for the time and to the extent such processing reasonably serves the purposes of archiving in the public interest, journalism, literature and art, scientific or historical research and statistical analysis, and subject to the protection of this Privacy Policy. For example, if you are an author, your personal information may continue to be published in connection with your article indefinitely. When we have no ongoing legitimate business need to process your personal information, we will either delete or anonymize it, or, if this is not possible (for example, because your personal information has been stored in backup archives), then we will securely store your personal information and isolate it from any further processing until deletion is possible.
  • Onward Transfer to Third Parties: As noted in the "How We Share Your Data" Section above, JD Supra may share your information with third parties. When JD Supra discloses your personal information to third parties, we have ensured that such third parties have either certified under the EU-U.S. or Swiss Privacy Shield Framework and will process all personal data received from EU member states/Switzerland in reliance on the applicable Privacy Shield Framework or that they have been subjected to strict contractual provisions in their contract with us to guarantee an adequate level of data protection for your data.

California Privacy Rights

Pursuant to Section 1798.83 of the California Civil Code, our customers who are California residents have the right to request certain information regarding our disclosure of personal information to third parties for their direct marketing purposes.

You can make a request for this information by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
150 Harbor Drive, #2760
Sausalito, CA 94965

Some browsers have incorporated a Do Not Track (DNT) feature. These features, when turned on, send a signal that you prefer that the website you are visiting not collect and use data regarding your online searching and browsing activities. As there is not yet a common understanding on how to interpret the DNT signal, we currently do not respond to DNT signals on our site.

Access/Correct/Update/Delete Personal Information

For non-EU/Swiss residents, if you would like to know what personal information we have about you, you can send an e-mail to privacy@jdsupra.com. We will be in contact with you (by mail or otherwise) to verify your identity and provide you the information you request. We will respond within 30 days to your request for access to your personal information. In some cases, we may not be able to remove your personal information, in which case we will let you know if we are unable to do so and why. If you would like to correct or update your personal information, you can manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard. If you would like to delete your account or remove your information from our Website and Services, send an e-mail to privacy@jdsupra.com.

Changes in Our Privacy Policy

We reserve the right to change this Privacy Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our Privacy Policy will become effective upon posting of the revised policy on the Website. By continuing to use our Website and Services following such changes, you will be deemed to have agreed to such changes.

Contacting JD Supra

If you have any questions about this Privacy Policy, the practices of this site, your dealings with our Website or Services, or if you would like to change any of the information you have provided to us, please contact us at: privacy@jdsupra.com.

JD Supra Cookie Guide

As with many websites, JD Supra's website (located at www.jdsupra.com) (our "Website") and our services (such as our email article digests)(our "Services") use a standard technology called a "cookie" and other similar technologies (such as, pixels and web beacons), which are small data files that are transferred to your computer when you use our Website and Services. These technologies automatically identify your browser whenever you interact with our Website and Services.

How We Use Cookies and Other Tracking Technologies

We use cookies and other tracking technologies to:

  1. Improve the user experience on our Website and Services;
  2. Store the authorization token that users receive when they login to the private areas of our Website. This token is specific to a user's login session and requires a valid username and password to obtain. It is required to access the user's profile information, subscriptions, and analytics;
  3. Track anonymous site usage; and
  4. Permit connectivity with social media networks to permit content sharing.

There are different types of cookies and other technologies used our Website, notably:

  • "Session cookies" - These cookies only last as long as your online session, and disappear from your computer or device when you close your browser (like Internet Explorer, Google Chrome or Safari).
  • "Persistent cookies" - These cookies stay on your computer or device after your browser has been closed and last for a time specified in the cookie. We use persistent cookies when we need to know who you are for more than one browsing session. For example, we use them to remember your preferences for the next time you visit.
  • "Web Beacons/Pixels" - Some of our web pages and emails may also contain small electronic images known as web beacons, clear GIFs or single-pixel GIFs. These images are placed on a web page or email and typically work in conjunction with cookies to collect data. We use these images to identify our users and user behavior, such as counting the number of users who have visited a web page or acted upon one of our email digests.

JD Supra Cookies. We place our own cookies on your computer to track certain information about you while you are using our Website and Services. For example, we place a session cookie on your computer each time you visit our Website. We use these cookies to allow you to log-in to your subscriber account. In addition, through these cookies we are able to collect information about how you use the Website, including what browser you may be using, your IP address, and the URL address you came from upon visiting our Website and the URL you next visit (even if those URLs are not on our Website). We also utilize email web beacons to monitor whether our emails are being delivered and read. We also use these tools to help deliver reader analytics to our authors to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

Analytics/Performance Cookies. JD Supra also uses the following analytic tools to help us analyze the performance of our Website and Services as well as how visitors use our Website and Services:

  • HubSpot - For more information about HubSpot cookies, please visit legal.hubspot.com/privacy-policy.
  • New Relic - For more information on New Relic cookies, please visit www.newrelic.com/privacy.
  • Google Analytics - For more information on Google Analytics cookies, visit www.google.com/policies. To opt-out of being tracked by Google Analytics across all websites visit http://tools.google.com/dlpage/gaoptout. This will allow you to download and install a Google Analytics cookie-free web browser.

Facebook, Twitter and other Social Network Cookies. Our content pages allow you to share content appearing on our Website and Services to your social media accounts through the "Like," "Tweet," or similar buttons displayed on such pages. To accomplish this Service, we embed code that such third party social networks provide and that we do not control. These buttons know that you are logged in to your social network account and therefore such social networks could also know that you are viewing the JD Supra Website.

Controlling and Deleting Cookies

If you would like to change how a browser uses cookies, including blocking or deleting cookies from the JD Supra Website and Services you can do so by changing the settings in your web browser. To control cookies, most browsers allow you to either accept or reject all cookies, only accept certain types of cookies, or prompt you every time a site wishes to save a cookie. It's also easy to delete cookies that are already saved on your device by a browser.

The processes for controlling and deleting cookies vary depending on which browser you use. To find out how to do so with a particular browser, you can use your browser's "Help" function or alternatively, you can visit http://www.aboutcookies.org which explains, step-by-step, how to control and delete cookies in most browsers.

Updates to This Policy

We may update this cookie policy and our Privacy Policy from time-to-time, particularly as technology changes. You can always check this page for the latest version. We may also notify you of changes to our privacy policy by email.

Contacting JD Supra

If you have any questions about how we use cookies and other tracking technologies, please contact us at: privacy@jdsupra.com.

- hide