CPUC Adopts Transitional Net Metering Rules for Pre-Existing Distributed Generation Systems

Stoel Rives LLP
Contact

On Thursday, March 27, 2014, the California Public Utilities Commission established rules for transitioning distributed generation renewable energy systems from the current net energy metering  (NEM) arrangement to the successor tariff which will be adopted by the CPUC in 2015.

The decision, D.14-03-041, was mandated by last year’s passage of AB 327, requiring implementation of changes to California’s NEM program by 2017.  AB 327 specifically directed the CPUC to establish a transition period for “pre-existing” systems based on a “reasonable expected payback period” and other factors consistent with California’s policy to promote the use of renewable energy.  Under the legislation, systems installed prior to the earlier of July 1, 2017, or the date upon which the customer’s utility reaches the 5% cap on its capacity subject to the net metering tariff, would be eligible for the transition period.   

The CPUC decided that 20 years from the date of installation (interconnection) would be the transition period for pre-existing systems.   The adopted period is longer than advocated by the utilities and certain ratepayer organizations and shorter than urged by some members of the solar industry and local governments.  The Commission also rejected arguments that customers installing systems after adoption of the transition rule should have shorter transition periods on the theory that they had notice of the coming change in tariffs and therefore could not have had reasonable expectations of more lengthy “payback” periods.  

Along with setting the length of the transition period, the Commission decided that a system would not lose its qualification for the 20 year transition period by a modification increasing capacity less than 1kw or 10%, nor by its transfer to new ownership at the same location.   More substantial increases in capacity or transfer of a system to a new location would terminate the transition period for the affected system.

In future rulemakings, the CPUC will address what will replace the existing NEM tariff, as well as the circumstances under which storage systems will qualify for NEM arrangements.

 

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© Stoel Rives LLP | Attorney Advertising

Written by:

Stoel Rives LLP
Contact
more
less

PUBLISH YOUR CONTENT ON JD SUPRA NOW

  • Increased visibility
  • Actionable analytics
  • Ongoing guidance

Stoel Rives LLP on:

Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Custom Email Digest
- hide
- hide