Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Intellectual Property Challenges in the Renewable Energy Sector - Energy Law Insights
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Election Roundup: How a Trump Administration Could Shape the Oil and Gas Landscape
Election Roundup: How a Harris Administration Could Shape the Oil and Gas Landscape
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Business Better Podcast Episode: Sustainability Spotlight – A Conversation with Vicinity Energy
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
State Low Carbon Fuel Standard Outlook
Podcast - Carbon Markets Lightning Round: State and Federal Updates
Inflation Reduction Act Tax Trends Begin to Take Shape
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
Unpacking FERC's Transmission Planning and Permitting Final Rules
Small Refinery Exemption Litigation Update
Data Centers: Demand, Development, and Future Challenges With Ali Greenwood — TAG Infrastructure Talks Podcast
Final Rules for Prevailing Wage & Registered Apprenticeships at Clean Energy Projects - The Department of the Treasury and Internal Revenue Service (IRS) recently announced final rules implementing the prevailing wage and...more
The Federal Energy Regulatory Commission (FERC) has issued Order No. 1920, which adopts specific requirements for transmission providers to conduct long-term planning for regional transmission facilities and determine how to...more
The U.S. Department of Labor (DOL) announced it has finalized its new rule relating to the Davis-Bacon Act (DBA). This rule goes into effect 60 days after it is officially published in the Federal Register. The final rule...more
On July 28, the Federal Energy Regulatory Commission (FERC or the Commission) issued Order No. 2023 (Order No. 2023 or Final Rule), which updates the procedures for interconnecting large generating facilities (20MW and above)...more
On July 20, 2023, the Ohio Power Siting Board (“Board” or “OPSB”) issued its final determination on a comprehensive set of proposed revisions to the rules governing the procedures before the OPSB and its siting criteria. The...more
The move represents a step forward for the small modular nuclear reactor industry, but legislative uncertainty over new nuclear facilities in the US remains. As part of long-range plans to address climate change, many...more
The US Treasury Department and the IRS provided practical administrative rules for the carbon capture and sequestration tax credit. Key Points: ..The IRS finalized the third set of rules in a series of regulatory guidance...more
On July 16, 2020, the Federal Energy Regulatory Commission (FERC or the Commission) overhauled its regulations under the Public Utility Regulatory Policies Act of 1978 (PURPA), which had been largely unchanged since 1980....more
Frustrated by some states’ use of their Clean Water Act (CWA) section 401 authority to oppose or delay energy projects—particularly the transportation of fossil fuels—the Trump Administration last Friday issued the second...more
On January 13, the U.S. Fish and Wildlife Service (Service) released its Final 4(d) Rule for the Northern Long-Eared Bat (Final Rule). The Final Rule greatly expands upon the scope of the interim 4(d) rule that the Service...more
On August 11, 2015, the US District Court for the Northern District of California remanded a US Fish & Wildlife Service’s (FWS) 2013 final rule that had extended the maximum duration of eagle take programmatic permits under...more
On Friday, the Internal Revenue Service (IRS) issued Notice 2014-46, which clarifies the rules for a wind project to be deemed to have started construction in 2013 as is necessary to be eligible for production tax credits...more