Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Intellectual Property Challenges in the Renewable Energy Sector - Energy Law Insights
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Election Roundup: How a Trump Administration Could Shape the Oil and Gas Landscape
Election Roundup: How a Harris Administration Could Shape the Oil and Gas Landscape
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Business Better Podcast Episode: Sustainability Spotlight – A Conversation with Vicinity Energy
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
State Low Carbon Fuel Standard Outlook
Podcast - Carbon Markets Lightning Round: State and Federal Updates
Inflation Reduction Act Tax Trends Begin to Take Shape
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
Unpacking FERC's Transmission Planning and Permitting Final Rules
Small Refinery Exemption Litigation Update
Data Centers: Demand, Development, and Future Challenges With Ali Greenwood — TAG Infrastructure Talks Podcast
It’s a busy time for the Federal Energy Regulatory Commission (the “Commission” or “FERC”). In March 2024, FERC issued Order No. 2023-A upholding its major generator interconnection reform order, Order No. 2023. FERC followed...more
On May 8, 2024, the U.S. Department of Energy (“DOE”) released a preliminary list of potential National Interest Electric Transmission Corridors (“NIETCs”), representing another step forward in DOE’s efforts to effectuate...more
On March 19, 2024, the North American Electric Reliability Corporation (“NERC”) asked the Federal Energy Regulatory Commission (“FERC”) to approve revisions to NERC’s Rules of Procedure (“ROP”) that would require certain...more
On March 21, 2024, FERC issued a follow up rehearing order to its landmark Order No. 2023 generator interconnection reform rule, providing several clarifications and tweaks in response to industry comments. Improvements to...more
On July 28, 2023, in its first major overhaul of its standardized interconnection rules, procedures, and agreements since issuing Order No. 2003 20 years ago, the Federal Energy Regulatory Commission (Commission or FERC)...more
On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued a landmark order that reforms the generator interconnection process in response to a clear need for nation-wide improvements due to rapidly changing...more
On July 28, the Federal Energy Regulatory Commission (FERC or the Commission) issued Order No. 2023 (Order No. 2023 or Final Rule), which updates the procedures for interconnecting large generating facilities (20MW and above)...more
On July 28, 2023, the Federal Energy Regulatory Commission (“FERC”) issued Order No. 2023, its long- awaited final rule implementing sweeping reforms to generator interconnection processes. Order No. 2023 comes in the context...more
On July 27, 2023, the Federal Energy Regulatory Commission (“FERC” or the “Commission”) issued a final rule intended to revolutionize the interconnection process. Among other things, the final rule replaces the prior...more
On February 14, 2023, the D.C. Circuit Court of Appeals upheld FERC’s broad definition of qualifying facilities (“QF”) under the Public Utility Regulatory Policies Act of 1978 (“PURPA”). In Broadview Solar, LLC, 174 FERC ¶...more
In a “FERC after dark” order issued late yesterday, November 29, the Federal Energy Regulatory Commission (FERC) largely accepted a comprehensive reform of the PJM interconnection process that applies to both generation and...more
Supercharged and back online, Troutman Pepper’s Battery + Storage Podcast kicks off Season Three with guest Bill Marsan, American Transmission Company executive vice president and general counsel. In this episode, podcast...more
The Federal Energy Regulatory Commission recently issued a final rule, Order No. 880, revising its hydropower project inspection and safety regulations. The updates revise part 12 of FERC’s regulations and conclude an...more
The Federal Energy Regulatory Commission (FERC) issued an Advance Notice of Proposed Rulemaking (ANOPR), "Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator...more
FERC issued an advance notice of proposed rulemaking (ANOPR) in Docket No. RM21-17, seeking comment on the potential need for reform of Commission regulations necessary to improve regional transmission planning and cost...more
The board of managers of PJM Interconnection, L.L.C. (PJM) has directed PJM to prepare a proposal for filing with the Federal Energy Regulatory Commission (FERC) that will substantially reform the Minimum Offer Price Rule...more
Following a week of extremely cold temperatures which caused millions of Texans to be without power, in some cases for longer that three days, the Federal Energy Regulatory Commission (FERC) announced that it will be...more
On September 17, 2020, FERC addressed the American Wind Energy Association’s (“AWEA”) request for rehearing of a December 2019 order finding that Generator Interconnection Agreements (“GIAs”), Facilities Construction...more
On September 1, 2020, a sharply divided Federal Energy Regulatory Commission (FERC or the “Commission”) abandoned its long-standing approach for determining the “power production capacity” of a generation facility seeking...more
U.S. sitting on 145 GW of unused commercial solar potential, according to new Wood Mackenzie study - Bullet Greentech Media – August 10 - Wood Mackenzie is forecasting a 32 percent drop in commercial solar...more
On July 16, 2020, the Federal Energy Regulatory Commission (FERC or the Commission) overhauled its regulations under the Public Utility Regulatory Policies Act of 1978 (PURPA), which had been largely unchanged since 1980....more
For the first time in 15 years, the Federal Energy Regulatory Commission (FERC) significantly revamped key aspects of its regulations implementing the Public Utility Regulatory Policies Act of 1978 (PURPA). The 490-page final...more
On April 7, 2020, the Federal Energy Regulatory Commission (FERC) announced a technical conference “to discuss technical and market issues prompted by growing interest in projects that are comprised of more than one resource...more
Ohio Commission Requests Comment Delay for COVID-19 Emergency On March 18, PJM Interconnection, L.L.C (PJM) filed with the Federal Energy Regulatory Commission (FERC) proposed changes to its Tariff in compliance with FERC’s...more
The Federal Energy Regulatory Commission (FERC) on December 19, 2019, directed PJM Interconnection to extend its minimum offer price rule (MOPR) from new natural gas–fired electric generators to also cover any generator that...more