New Opportunities for Boosting Grid Security
Distributed Generation 2.0: What You Need to Know
The Challenges and Opportunities of Interconnection and Transmission of Renewable Energy
The Nexus of Transmission and Storage: A Conversation With American Transmission Company GC and Executive VP Bill Marsan - Battery + Storage Podcast
Nota Bene Episode 97: The Seismic Changes Renewables Are Bringing to Energy Transmission and Its Infrastructure with Mark Sundback
On May 13, the Federal Energy Regulatory Commission (FERC or Commission) released its Order No. 1920 (Final Rule) to reform its policies regarding Regional Transmission Planning and Cost Allocation.1 The Final Rule follows...more
On May 13, 2024, the Federal Energy Regulatory Commission (FERC or Commission) issued Order No. 1920,[1] its long-awaited Final Rule relating to long-term regional planning and regional cost allocation. This article...more
The Federal Energy Regulatory Commission (FERC) has issued Order No. 1920, which adopts specific requirements for transmission providers to conduct long-term planning for regional transmission facilities and determine how to...more
On May 13, 2024, the Commission announced two major transmission reform final rules: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation (“Order No. 1920”) and Applications for Permits...more
On October 19, 2023, FERC issued a final rule directing the North American Reliability Corporation (“NERC”) to develop or modify reliability standards to address reliability concerns attributable to inverter-based resources...more